LEADING EDGE ENDORSEMENTS AND ACCREDITATIONS
Construction Industry Development Board of Malaysia (CIDB) G7 License
The grade G7 license, issued by the Construction Industry Development Board (CIDB) Malaysia, permits GDB to undertake Civil Engineering Construction, Building Construction and Mechanical works projects.
CIDB Sijil Perolehan Kerja Kerajaan
The SPKK license certifies GDB as a Grade G7 contractor, enabling us to participate in tenders called by the government.
SIRIM ISO 9001 : 2015
SIRIM ISO 14001:2015
IQNet ISO 9001:2015
IQNet ISO 14001:2015
IQNET ISO 45001 : 2018
One Central Park – SHASSIC 5-Star (90%)
The use of effective safety and health practices at One Central Park was recognised with a stellar 5-Star (90%) rating in the SHASSIC assessment by CIDB.
Etiqa Office Tower – SHASSIC 5-Star (96%)
Our 5-Star (96%) rating in the SHASSIC assessment by CIDB for Etiqa Office Tower is proof of our ongoing commitment to safety and health at this project site.
AIRA Residence – SHASSIC 5-Star (98%)
AIRA Residence – CIDB SHASSIC ACHIEVER 5-Star
Perla Ara Sentral – SHASSIC 5-Star (91%)
Hyatt Centric Kota Kinabalu SHASSIC – Anugerah Kecemerlangan
Park Regent – SHASSIC 5-Star (94%)
SDPLOG 1 – SHASSIC 5-Star (92%)
KLIH – SHASSIC 5 -Star (94.67%)
One Central Park – CONQUAS (75.9 points)
The Construction Quality Assessment System (CONQUAS) serves as a standard assessment system on the quality of building projects. Our score of 75.9 points certifies One Central Park as a construction project of international quality, proven through the completion of the project 107days ahead of schedule.
KL Eco City (Parcel B) – BQUAS
KL Eco City became the first Malaysian construction project to receive the prestigious BQUAS certification, proof of our commitment to using progressive, internationally-recognised approaches and methodologies in our projects.
ETIQA Office Tower – BuildQAS
Westside III – BuildQAS
Hyatt Centric – BuildQAS
Park Regent – BuildQAS
E-Metro Logistics Park – BuildQAS
One Central Park – SIRIM 5S Certified Firm
Westside III – SIRIM Green 5S Certificate
The SIRIM Green 5-S (SIRIM-G5S) aligns the concept of Plan-Do-Check-Act (PDCA) with performance improvement in quality, environmental occupational health and safety management systems.
Aira Residence – Construction Green 5S (CG5S) Award from SIRIM
Aira Residence – Construction Green 5S (CG5S) Award from HK5SA
Park Regent – Construction Green 5S (CG5S) Award from SIRIM
One Central Park – CIDB QLASSIC (78%)
CIDB’s QLASSIC benchmarks quality of workmanship on construction projects. Our score of 78% for One Central Park was due in part to our use of progressive construction practices such as Industrialised Building System (IBS).
ETIQA Tower
Menara Hap Seng 3 – CIDB QLASSIC (86%)
CIDB’s QLASSIC benchmarks quality of workmanship on construction projects. Our score of 86% for Menara Hap Seng 3 indicates elite attainment in this area.
Menara Hap Seng 3 – High QLASSIC Achievement
We have been awarded the High QLASSIC Achievement by CIDB scoring 86% for our Menara Hap Seng 3 project. Our vision & mission is to construct excellent quality buildings and this achievement is a testament to that commitment.
Park Regent Project – CIDB QLASSIC (80%)
Our Park Regent project received a commendable score of 80% for the quality of workmanship demonstrated.
SDPLOG1 – CREAM QLASSIC (82%)
Our SDPLOG1 project received a commendable score of 82% for the quality of workmanship demonstrated.
SME Competitiveness Rating for Enhancement (SCORE)
15th MOSHPA OSH Excellence Award 2019 (Gold Award)
Anugerah COMBI Tapak Binaan
Westside III achieved First Place in the Wilayah Persekutuan Kuala Lumpur and Putrajaya COMBI (Communication for Behavioural Impact, a programme organised by Kementerian Kesihatan Malaysia & CIDB) Programme, illustrating our commitment to safety and health at the workplace.
Sijil Jabatan Keselamatan Dan Kesihatan Pekerjaan 2019
Special Recognition In The Building Contractors Category
Obtained a Special Recognition in the Building Contractors category awarded by Sime Darby Property Berhad during their 2024 Partners Dialogue attributed by our early completion of the SDPLOG 1 project which was handed over 31 days ahead of schedule, a testament to our project delivery commitments.
