OUR JOURNEY SO FAR

2013
  • Grand Dynamic Builders commenced business in the provision of construction services.
  • Grand Dynamic Builders registered with the CIDB as a Grade G7 contractor.

  • Grand Dynamic Builders secured its first contract with Perdana ParkCity Sdn Bhd as the main contractor for One Central Park Project located in Desa ParkCity, Kuala Lumpur.
2013
2014
  • Grand Dynamic Builders secured two (2) contracts with Trans Resources Corporation Sdn Bhd as the principal works contractor for KL Eco City Project 1 and KL Eco City Project 2 located in Jalan Bangsar, Kuala Lumpur.
2014
2015
  • Grand Dynamic Builders secured another contract with Perdana ParkCity Sdn Bhd as the main contractor for Westside III Project located in Desa ParkCity, Kuala Lumpur.
2015
2016
  • Grand Dynamic Builders secured a contract with BBCC Development Sdn Bhd as the main contractor for BBCC Project located in Jalan Pudu, Kuala Lumpur.

  • Grand Dynamic Builders secured a contract with Etiqa Insurance Berhad as the main contractor for Etiqa Project located in Jalan Bangsar, Kuala Lumpur.
  • Grand Dynamic Builders received a SHASSIC certificate from the CIDB by scoring 5 stars (90%) for the One Central Park Project.
2016
2017
  • Grand Dynamic Builders secured a contract with Selangor Properties Berhad as the main contractor for SPB Project (AIRA Residence) located in Damansara Heights, Kuala Lumpur.
  • Grand Dynamic Builders obtained the SPKK from the CIDB as a Grade G7 contractor that enables us to participate in tenders called by the Government.
  • Grand Dynamic Builders obtained a QLASSIC score of 78% from the CIDB for the One Central Park Project.
  • Grand Dynamic Builders obtained a CONQUAS score of 75.9 points from the Building and Construction Authority, Singapore for the One Central Park Project.
  • Grand Dynamic Builders obtained a SHASSIC certification from the CIDB by scoring 5 stars (98%) for the Westside III Project.
  • Grand Dynamic Builders obtained a BQUAS score of 75.7% from BQUAS Consulting Pte Ltd for the KL Eco City Project 2.
  • Grand Dynamic Builders was awarded first place for Anugerah COMBI Tapak Binaan 2017 from the Health Department Wilayah Persekutuan Kuala Lumpur and Putrajaya, Kuala Lumpur City Hall and CIDB for the Westside III Project.
  • Grand Dynamic Builders secured a contract with Hap Seng Land Development (Puchong) Sdn Bhd as the main contractor for Menara Hap Seng 3 Project located in Jalan P. Ramlee, Kuala Lumpur.
2017
2018
  • Grand Dynamic Builders obtained a SHASSIC certification from the CIDB by scoring 5 stars (96%) for the Etiqa Project.
2018
2019
  • Grand Dynamic Builders secured a contract with Trans Resources Corporation Sdn. Bhd. as the main contractor for Perla Ara Sentral, located in the heart of the township of Ara Damansara, Selangor.
  • Grand Dynamic Builders obtained a SHASSIC certification from the CIDB by scoring 5 stars (98%) for AIRA Residence
2019
Close Menu